Here is what I am looking at ,to get started in spring.
5 sharp 230 watt panels
5 enphase 190 240
All the needed railing to connect the panels on metal roof.
All connectors to connect to branch circuit for the 240 volt.
and one envoy
This would be the first phase to install and in 6 months I would want to order the same configuration.
If anymore would want to comment, if they see something I am forgeting or making a mistake please call me out on it.
I alway like to hear your freebacks.



Reply With Quote


Bookmarks