Last edited by CaptTurbo; February 27th, 2010 at 9:19 PST.
44 230 Watt Trina panels, 2 SB5000, 2 Sunny Island 5048U, Web Box, 48 volt (eight six volt T-105) battery bank
captturbo,
i addressed in his other post the reason for the deletion. if there weren't books he's trying to sell right next to the articles it would've been fine and i told him to replace the links when the business aspect is eliminated. you can certainly pm him for it, but i suspect his main intent was to sell and not inform. hope i'm wrong on that and he corrects this.
voltage drop calculator http://www.wind-sun.com/ForumVB/showthread.php?t=29
NIEL (not employed by naws)
Probably my favorite thread on this forum, good seeing so many pictures and real-life stories of solar. I'm mostly in the office working solar, so good to see things on the outside! Keep them coming (especially the personal blogs!)
just some quick pics of my install
My TED 5000 system
Sticking it to the power company one watt at a time!
60 Ningbo Electric 175 watt panels and 12 Canadian Solar 180 watt panels with 2 PVP 5200 Inverters
My TED 5000 system
Sticking it to the power company one watt at a time!
60 Ningbo Electric 175 watt panels and 12 Canadian Solar 180 watt panels with 2 PVP 5200 Inverters
Pics and links to my (work in progress) DIY solar 4 battery monitor hobby project.
1&2 inverter power cells 100Ah
3&4 controller power cells 12Ah
Data files, (early) drawings and notes:
http://mysite.ncnetwork.net/res02dad...rpic_files.zip
Controller P18F8722 code:
http://mysite.ncnetwork.net/res02dad...es/swm8722.zip
Build Slideshow:
http://www.flickr.com/photos/nsaspoo...34371746/show/
(after controller reboot, not synced with real battery state yet)
Battery 1&2:
Voltage, run-time (hr:min), state of charge (%), Ah used
Charge monitor:
Battery under charge. Max time on charger if C40 didn't go to float mode (monitor LED).
Pv voltage, Battery voltage, charge amps
Last edited by nsaspook; April 29th, 2010 at 9:11 PDT.
Unistrut pole mount: http://farm8.staticflickr.com/7058/6...df338c_b_d.jpg
niel... I'm gonna put a link to my website that I have to see if its ok.....if not delete the link and I'll just add pictures
the website is hosted here at my home and the server is run by the system that is on the link
http://southcentralkentuckysolar.com/photogallery.html
I have lots of updating to do to the website.....but don't have the time to do it
"what's that got to do with backyards and puppies"
6-190w sun, xw4548 inverter, xw 60-150 mppt cc, windblue 540 generator powered by 13hp ICE, 250aH rayovac (yup)
I'm gettin all the power it's got ,and it's still not throwin a breaker ...CDO 2013
Concrete. Rebar. Digging through fractured sandstone and North Alabama clay. Temporary guy lines. Bailing out the excavation, only five, 5-gallon pales per day. Finally the concrete is poured and time to move on. EIGHT yards for this 18.5 foot tall 10 inch schedule 40 pipe with a final height of 14.5 feet above ground. I'll post a few more pictures now that I am getting the hang of it.
A couple more photos of the rebar and mast installation
Bookmarks