    Default Junction Box

    Hello

    I want to install 24 kW photovoltaic system. I bought inverters (SMC8000TL) and solar panels. So I just have to connect them to the grid (380V/50Hz). From the AC side of Inverters to the Junction Box i have 3 mono phase cables. I put them throught 3 fuses 40A and then on the exit of fuses I put 3 phase cable for 380V. So the question is what is better to use 1 pole fuse( for each cable) or 3 pole fuse (I=34.78A). Does anybody can show pics of some already install Junction Boxes.

    Best Regards

  2. #2
    Join Date
    Apr 2007
    Location
    Lakeland Florida
    Posts
    1,959

    Default Re: Junction Box

    400V / 24kw / Three phase is at a minimum a job for a licensed electrican, NOT a do it yourself job with info off the internet. Anyone even thinking of providing information would be putting people in harms way ...

    You will need to be signed off by your local jurisdiction, I'm sure they will require properly certified professionals to have installed with permits so start there for your questions

  3. #3
    Join Date
    Sep 2006
    Location
    Willits, CA
    Posts
    4,962

    Default Re: Junction Box

    24KW is an ambitious system, and beyond the scale of anything I've seen. Good luck to you.

    My gut feeing is a fuse on each leg, where it connects to each inverter. Of course it's got to have it's proper enclosure and such.
    http://tinyurl.com/LMR-Solar
    http://tinyurl.com/LMR-BigLug
    http://tinyurl.com/LMR-NiFe

    Grundfos 10 SO5-9 with 3 wire Franklin motor (1/2hp 240V 1ph # 214505 ) on a timer for 3 hr noontime run - Runs off PV
    Powerfab poletop PV mount | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe battery | 15, Evergreen 205w "12V" PV | Midnight ePanel || VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT

  4. Default Re: Junction Box

    Hello,

    With utmost respect, I'd suggest that if you bought 3 x 8 kW inverters, and appropriate solar panels to match, that the extra money to pay a professional to hook it up will be small in comparison. You can save money by doing the physical install of the panels yourself, or with your own people, then let the pro do the electrical, at least the AC side.

    If you are still in the planning stages and have not bought anything yet, that's even better, because engaging a consultant to at least crudely specify array layout, sizing, and components could actually save you money over just buying things and trying to make it all work later.

Similar Threads

  1. Solar Junction Can’t Keep up with Multi-junction PV Cell Demand
    By RSSfeed in forum Solar Energy News RSS Feed
    Replies: 0
    Last Post: May 26th, 2012, 19:10 PDT
  2. HELP! MC4 and Junction Boxes
    By lwilli01 in forum Solar Beginners Corner
    Replies: 6
    Last Post: March 31st, 2011, 17:39 PDT
  3. Roof Junction box
    By PaGuy in forum PV Installers Forum - NEC, Wiring, Installation
    Replies: 9
    Last Post: August 12th, 2010, 18:24 PDT
  4. BP 585U Junction Box
    By firefly in forum Off Grid Solar & Battery Systems
    Replies: 3
    Last Post: August 3rd, 2009, 15:45 PDT
  5. making a junction box
    By jayven in forum General Solar Power Topics
    Replies: 7
    Last Post: July 21st, 2007, 0:02 PDT

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •